Tuesday, 27 October 2009

26th October 2009

Tam and Cyril attach top halves to the ramp support piles and seem to have quite a job getting them to stand vertically in the splices as the bottom halves started vertical but went off slightly when they bottomed out on the hard layer below the mud. Anglian Water turn up with a digger and sheet piling and go down over 2 metres before they find 2 old stop cocks buried in the river wall, one of which is leaking. "Why are there 2?" You might ask - that is a mystery especially as one pipe heads back towards the bandstand! Anyway, all is fixed by the end of the day.