Wednesday, 9 December 2009

24th November 2009

The platform at the top of the ramp is starting to look fairly complete with the handrail support beam in place. Another improvement is made by using a spare top section of a pile to link the platform right back to the club by crossing both ranks of piles.

It was a shame that one of the greenheart piles was trimmed about 30mm short, the only one where this happened out of 29 piles and unforunately just about the only pile where this would be visible! So a pad is made to fit on the pile and John declares that this is not a problem from a structural perspective so we don't have to put another length of timber in its place.